Gå til innhold

Fem ingeniører arrestert etter gruveulykken


Anbefalte innlegg

Videoannonse
Annonse
  • 2 uker senere...

Dam I of Córrego do Feijão Mine is used to dispose tailings from ore production and was located in Brumadinho, Minas Gerais. It was inactive (no tailings were being added), there was no pond and there was no other type of operational activity in progress. A decommissioning project was also under development.

 

The dam was built in 1976 by Ferteco Mineração (acquired by Vale on April 27, 2001), using the upstream method. The height of the dam was 86 meters and had a crest length of 720 meters. The waste disposal area was 249.5 thousand m2 and the volume disposed was 11.7 million m3.

Lenke til kommentar

Opprett en konto eller logg inn for å kommentere

Du må være et medlem for å kunne skrive en kommentar

Opprett konto

Det er enkelt å melde seg inn for å starte en ny konto!

Start en konto

Logg inn

Har du allerede en konto? Logg inn her.

Logg inn nå
  • Hvem er aktive   0 medlemmer

    • Ingen innloggede medlemmer aktive
×
×
  • Opprett ny...