Gå til innhold

nVidia Maxwell tråden (GTX 800-serien)


kalleklovn12

Anbefalte innlegg

NVIDIA Maxwell GeForce 800M Mobility Lineup Launches in February 2014

(Dette gjelder IKKE stasjonære pc'er, men tenkte at dette kanskje kan gi en indikasjon, spesielt med tanke på vram.)

 

NVIDIA’s Maxwell graphics cards are highly anticipated by fans of the green side since we have been stuck with Kepler for two years although the GK110 was just introduced in Q1 2013. AMD after a hiatus of two years with their Southern Islands HD 7000 series chips went ahead to unveil their latest Volcanic Islands lineup in October this year and although most of the cards are rebrands, the Hawaii and other chips do offer some mean power for the asking price.

All eye’s are on NVIDIA now as they get ready for the launch of their Maxwell based GeForce chips and although they new chips are aimed towards Mobility users, the desktop chips are still reportedly shipping in March 2014 so we have some time before an upgrade is due on the PC side.

As for the mobility side, the GeForce 800M Mobility series will span all the way from the top tier GeForce GTX 880M and the entry level GeForce GT 840M. So let’s talk about the GPUs themselves, NVIDIA’s first tier chips would be MXM design which means they would be interchangeable, upgradable and even offer SLI support on some notebook designs. Following is the list of the MXM chips:

  • GeForce GTX 880M 8 GB / N15E-GX-A2
  • GeForce GTX 870M 6 GB / N15P-GT
  • GeForce GTX 860M 4 GB / N15P-GX

Next up, we have the entry level models which will feature the onboard design which mean that these GPUs will be permanently soldered to the mainboard hence no upgrading can be possible. The GeForce 800M GT lineup will include the following GPUs:

  • GeForce GTX 860M 2 GB GDDR5 / N15P-GX
  • GeForce GTX 850M 2 GB DDR3 / N15P-GT
  • GeForce GT 840M 2 GB DDR3 / N15S-GT1

Update - The specified memory is not the actual VRAM of the chips but the system ram for the entire notebook. The VRAM has yet to be defined by NVIDIA.

Its nice to see the high VRAM on the next generation Maxwell GeForce 800M chips with GTX 880M doubling that of the current fastest GTX 780M GPU. Its not known though whether these chips are actually rebranded Kepler chips or they actually built on the new Maxwell architecture but based on a 28nm process since 20nm around Q1 2014 is not possible for both GPU manufacturers and current TSMC schedules hint at a Q2/Q3 launch of 20nm GPUs. AMD themselves are preparing their Crystal Series Mobility lineup which is based around the GCN Volcanic Islands architecture, codenamed as R200M series and would debut around Q1 2014.

There’s a rumor that the high-end GTX chips could actually feature the 28nm Maxwell architecture from NVIDIA with Unified Memory Architecture (UMA) while the entry level onboard chips may be rebranded Kepler parts. We expect NVIDIA would detail more information on their upcoming graphic card lineups at their event during CES 2014 so stay tuned.

Read more: http://wccftech.com/nvidia-maxwell-geforce-800m-mobility-lineup-launches-february-2014-geforce-gtx-880m-8-gb-lead-pack/#ixzz2ndHFRBQw

post-269632-0-40942600-1387189887_thumb.png

post-269632-0-58081700-1387189888_thumb.png

Endret av kalleklovn12
Lenke til kommentar
Videoannonse
Annonse

Noen steder står det at TSMC begynner produksjonen av 20nm i første kvartal, andre steder står det til sommeren, hva er det mest sannsynlige? Maxwell med 20nm til våren hadde uansett vært konge!

Det hadde vært konge, men desverre svært tvilsomt. Det sies at masseproduksjonen av 20nm vi komme skikkelig i gang til sommeren. Dermed blir det nok ikke noen gpuer med 20nm før 3-4 kvartal 2014. Kanskje til og med 2015.

Lenke til kommentar

Noen steder står det at TSMC begynner produksjonen av 20nm i første kvartal, andre steder står det til sommeren, hva er det mest sannsynlige? Maxwell med 20nm til våren hadde uansett vært konge!

Må huske på at det er litt forskjell på å starte med produksjonen, og det at vi får se noen ferdige produkter og skikkelig masseproduksjon. :) Tar jo ofte et par måneder, minst.

 

Er nesten alltid noen små problemer som må løses når man kjører i gang med ny produksjonsnode.

Lenke til kommentar

Noen steder står det at TSMC begynner produksjonen av 20nm i første kvartal, andre steder står det til sommeren, hva er det mest sannsynlige? Maxwell med 20nm til våren hadde uansett vært konge!

Mobilbrikker starter i første kvartal mens GPUer og andre høyeffektsdesign skal starte senere såvidt jeg har forstått.

 

EDIT:

Stiller meg tvilende til at Nvidia kommer til å komme med 20nm-kort flere måneder før AMD, historien har vist at AMD har vært raskere til å få til design på nye noder enn Nvidia.

Endret av arni90
Lenke til kommentar
  • 3 uker senere...

Hvis dette er sant så gidder ikke jeg å vente til slutten av 2014 til begynnelsen av 2015 :/ Dumme 20mm :p

 

Går nok for 780 Classifield, Ser ikke ut til at de nye modellene er så mye bedre vel?? :)

Lenke til kommentar

Opprett en konto eller logg inn for å kommentere

Du må være et medlem for å kunne skrive en kommentar

Opprett konto

Det er enkelt å melde seg inn for å starte en ny konto!

Start en konto

Logg inn

Har du allerede en konto? Logg inn her.

Logg inn nå
  • Hvem er aktive   0 medlemmer

    • Ingen innloggede medlemmer aktive
×
×
  • Opprett ny...